|
|
|
PublicationsA GUIDE TO CONTINUOUS SHIFT WORK (4th EDITION)CONTENTS
1. INTRODUCTION 1
2. THE BASIC INFORMATION REQUIRED 4
BACKGROUND 4
GENERAL POINTS 4
b) Current Practice 5 c) Period the Information Relates to 6
MAIN TYPES OF INFORMATION 7
a) Production/Operating Hours Required 7 i) Basic production/operating hours 7 ii) Adjustments to paid hours per shift 8 iii) Variations in the level of cover 9 iv) Additional cover required 9
b) Annual Hours Available per Employee 10 i) Gross employee hours available 10 ii) Additional hours 11 iii) Planned absence 11 iv) Unplanned absence 12 v) Common terms and conditions ? 13
c) Potential, Known or Anticipated Change. 13
TWO CHECKLISTS 14
3. THE BASIC ARITHMETIC 17
BACKGROUND 17
ILLUSTRATIVE BASIC INFORMATION 17
a) Production/Operating Hours Required 17
b) Employee Hours Available 19
c) Potential, Known or Anticipated Change 20
d) The Relevant Time Period. 21
ILLUSTRATIVE BASIC ARITHMETIC 21
a) Total Production Hours Required 21
b) Employee Hours Available 23
c) The Number of Teams Used 24 i) Predetermined 24 ii) Rule of thumb calculations 24 iii) Whole number used 26
d) Production Hours Required per Team/Employee 26
e) Surplus/Deficit of Employee Hours Available 29
f) Potential, Known or Anticipated Change 31 i) Introduction Of Unpaid Meal Breaks and Overlaps 31 Weekly basis 31 Annual basis 32 ii)Reduced Basic Week and Increased Holiday Entitlements 32 iii) Definition of a Day’s Holiday 33
CONCLUDING COMMENTS 34
4. THE TRADITIONAL AND ANNUAL HOURS APPROACHES 35
BACKGROUND 35
MAIN FEATURES 36
a) Traditional Approach 36
a) Annual Hours approach 38
METHODS OF ALIGNMENT 41
a) Traditional Approach 41 i) Aligning Gross Hours 42 Contractual Overtime 42 Running Light during Time Off in Lieu 42 Voluntary Overtime plus Time Off in Lieu 43 Additional Team Members plus Time Off in Lieu 44 Central Pool of Spares plus Time Off in Lieu 44
ii) Aligning Net Hours 46 Shutdowns 47 Voluntary Overtime 48 Buddy System 48 Additional Team Members 49 Central Pool of Spares 50
b) Annual Hours Approach 51 i) Surplus of Employee Hours 51 Adjustment to Pay 52 No Adjustment to Pay 52 Overlaps 53 Additional Rostered Shifts 53 Extended Shifts 54 Integrate Other Tasks 55 Reserve Pool 55 Cover Pool 56 Change the Basic Parameters 57 Reduce the length of the normal basic week 57 Increase holiday entitlements 57 Cut or eliminate shutdowns 57 Cut or eliminate unpaid meal breaks 57 Decrease the number of teams 57
ii) Deficit of Employee Hours 58 Rostered Contractual Overtime 58 Pool of Contractual Hours 59 Shutdowns 59 Running Light during Time Off in Lieu 60 Voluntary Overtime plus Time Off in Lieu 61 Additional Team members plus time Off in Lieu 61 Central Pool of Spares plus Time Off in Lieu 62 Floating Holidays 63 Change the Basic Parameters 64 Increase the length of the normal basic week 64 Decrease holiday entitlements 64 Introduce or extend shutdowns 64 Introduce or extend unpaid meal breaks 64 Increase the number of teams 64 Vary the level of cover. 65
CONCLUDING COMMENTS 65
5. REVIEW OF THE BASIC PARAMETERS 66
BACKGROUND 66
DEGREE OF ROTATION 66
a) Non Rotating 67 i) Full-time 67 ii) Mixed, Full and Part-time 67
b) Partially Rotating 68 i) Full-time 69 ii) Mixed, Full and Part-time 69
c) Split Rotation 70
d) Fully Rotating 70
e) Some General Points 71 i) Advantages 71 ii) Disadvantages 71
CHARACTERISTICS 71
a) Technical Features 71
i) Number of Teams Used 71
ii) Length and Number of daily Shifts 74 i) Equal Length Shifts on Each Day 74 ii) Irregular Length Shifts within a Day 75 iii) Change in the Number of Shifts by Day in the Week 76 iv) Change in the Number of shifts by Time of Year 77
iii) Shift Starting And Finishing Times 77
iv) Number of Shifts Worked in Succession 78
v) Distribution of Rest Days 80
vi) Starting Point of the Rota 83
vii) Length of the Shift Cycle 84
b) Speed and Direction of Rotation 84
i) Speed of Rotation within Blocks of Shifts 84
ii) Speed of Rotation Across Blocks of Shifts 86
iii) Direction of Rotation Across Blocks of Shifts 87 i) Rest Periods within Blocks of Shifts 87 ii) Duration of Each Block of Shifts 87 iii) Rest periods between Blocks of Shifts 87
iv) Number of Rotations within Blocks of Shifts 90
v) Direction of Rotation within Blocks of Shifts 90 i) Types of Rotation 90 Two Shifts a Day 90 Three Shifts a Day 91 Four Shifts a Day 91 i) Rest Periods 91 Rest Periods within Blocks of Shifts 93 Duration of Each Block of Shifts 93 Rest periods between Blocks of Shifts 93
CONCLUDING COMMENTS 95
6. OTHER ISSUES 96
PROVISION OF ADDITIONAL COVER 96
a) Extended Shifts 97 b) Rest Day Working 98
FLOATING HOLIDAYS 100
a) Surplus of Employee Hours Available 100 b) Deficit of Employee Hours Available 101
ANNUAL HOURS ROTAS WITH NON-ROSTERED HOLIDAYS 102
ROSTERED HOLIDAYS AND EXTENDED REST PERIODS. 104
a) Cycle with Extended Rest Periods 104 b) Holiday Rotas. 105
VARIABLE LEVEL OF ROSTERED COVER 106
a) Increased Cover 107 i) Reserve Weeks 107 ii) Integrated Days 108
b) Reduced Cover. 109
BALANCING HOURS WORKED 109
a) Shutdowns 110 b) Adjustments to the Pattern of Working Time 110 c) Christmas Adjustment 111 d) Owed Hours Variations 112
BANK/CUSTOMARY HOLIDAY WORKING 113
a) No Adjustment 113 b) Consolidated Average Incidence 113 c) Payment as Incurred 114 d) Time Off in Lieu 114 e) Payment plus Time Off in Lieu 114
OTHER BALANCING ADJUSTMENTS 115
a) Incidence of Holidays/Extended Rest Periods 115 b) Owed Hours/Pay Back Shifts. 115 c) Incidence of Bank Holiday Working 115 d) Incidence of Starts and finishes. 116
CONCLUDING COMMENTS 116
7. SUMMARY OF THE MAIN STEPS 117
APPENDIX I. SUMMARIZED EXAMPLES OF THE BASIC 121 ARITHMETIC
APPENDIX II. ILLUSTRATIVE ROTAS 131
ROTA SYMBOL KEY 140
INDEX OF TABLES
THREE TEAM ROTAS
Two (12hr) Shifts a Day
A Two day, Single 141 B Four Day, Single 142 C Four Day, ( 2 x 2 ) 143 D Six Day, ( 3 x 3 ) 144
FOUR TEAM ROTAS
Three (8hr) Shifts a Day
1 Three Day, Single 145 2 Three Day, (1x1x1) 146 3 Four Day, Single 147 4 Five Day Single 149 5 Six Day, Single 151 6 Six Day, Single, Variant 1 153 7 Six Day, (2x2x2) 155 8 Seven Day, Single 156 9 Seven Day, Single, Variant 1 157 10 Seven Day, Single, Variant 2 158 11 Seven Day, (2x2x3) 159 12 Seven Day, (2x2x3), Variant 1 160 13 Seven Day, (2x2x3), Variant 2 161 14 Seven Day, Mixed 162 15 Nine Day, (3x3x3) 163 16 Twenty-one Day, (7x7x7) 164 17 Mixed, Two and Four Day 165 18 Mixed, Six and Three Day 166
Two (12hr) Shifts a Day
19 Two Day Single 167 20 Three Day, Single 168 21 Four Day, Single 169 22 Four Day, (2x2) 171 23 Five Day, Single 172 24 Six Day, Single 174 25 Six day, (3x3) 176 26 Seven Day, Single 177 27 Mixed, Two and Three Day 178 28 Mixed, Four and five Day 179
FOUR AND A HALF TEAM ROTAS
Three (8hr) Shifts a Day
29 Two Day, Single 180 30 Three Day, Single 181 31 Three Day, (1x1x1) 183 32 Four Day, Single 184 33 Four Day, Single, Variant 1 186 34 Five Day Single 188 35 Six Day, Single 191 36 Six Day, Single, Variant 1 193 37 Six Day, (2x2x2) 195 38 Six Day, (2x2x2), Variant 1 196 39 Six Day, (2x2x2), Variant 2 197 40 Six Day, (3x3) 198 41 Seven Day, Single 200 42 Seven Day, Single, Variant 1 201 43 Seven Day, (2x2x3) 202 44 Seven Day, (2x2x3), Variant 1 203 45 Seven Day, (2x2x3), Variant 2 204 46 Twenty-one Day, (7x7x7) 205
Two (12hr) Shifts a Day
47 Two Day Single 206 48 Four Day, Single 207 49 Four Day, (2x2) 209 50 Seven Day, Single 210 51 Mixed, Two and Three Day 211
FIVE TEAM ROTAS
Three (8hr) Shifts a Day
52 Three Day, Single 212 53 Three Day, Single, Variant 1 214 54 Three Day, (1x1x1) 215 55 Three Day, (1x1x1), Variant 1 216 56 Four Day, Single 217 57 Four Day, Single, Variant 1 219 58 Five Day Single 221 59 Six Day, Single 223 60 Six Day, (2x2x2) 225 61 Six Day, (2x2x2), Variant 1 226 62 Six Day, (2x2x2), Variant 2 227 63 Six Day, (2x2x2), Variant 3 228 64 Seven Day, Single` 229 65 Seven Day, Single, Variant 1 230 66 Seven Day, Single, Variant 2 231 67 Seven Day, Single, Variant 3 232 68 Seven Day, Single, Variant 4 233 69 Seven Day, Single, Variant 5 234 70 Seven Day, (2x2x3) 235 71 Seven Day, (2x2x3), Variant 1 236 72 Seven Day, (2x2x3), Variant 2 237 73 Seven Day, (2x2x3), Variant 3 238 74 Seven Day, (2x2x3), Variant 4 239 75 Seven Day, Mixed 240 76 Nine Day, (3x3x3) 241 77 Twenty-one Day, (7x7x7) 242 78 Mixed, Two and Three Day 243 79 Mixed, Two and Three Day, Variant 1 244 80 Mixed, Two, Three and Five Day 245 81 Mixed, Two and Four Day 246 82 Mixed, Two and Five Day 248 83 Mixed, Three and Four Day 249 84 Mixed, Three and Four Day, Variant 1 250 85 Mixed, Three, Four and Seven Day 251 86 Mixed, Three, Four and Seven Day, Variant 1 252 87 Mixed, Three, Four and Seven Day, Variant 2 253 88 Mixed, Three, Four and Seven Day, Variant 3 254 89 Mixed, Three and Six Day 255 90 Mixed, Four and Five Day 257
Two (12hr) Shifts a Day
91 Two Day Single 258 92 Two Day, Single, Variant 1 259 93 Three Day, Single 260 94 Three Day, Single, Variant 1 261 95 Four Day, Single 262 96 Four Day, (2x2) 264 97 Four Day, (2x2), Variant 1 265 98 Five Day, Single 266 99 Five Day, (2x3) 268 100 Six Day, Single 270 101 Six Day, (3x3) 272 102 Seven Day, Single 273 103 Mixed, Two and Three Day 274 104 Mixed, Three and Four Day 275 105 Mixed, Four and five Day 276
Four (6hr) Shifts a Day
106 Four Day, Single 277 107 Four Day, (2x2) 279 108 Five Day Single 280 109 Six Day, Single 282 110 Six Day, (3x3) 284 111 Six Day, (3x3) Variant 1 285 112 Seven Day, Single 286 113 Eight Day, (2x2x2x2) 287
Mixed, Three (8hr) and Two (12hr) Shifts a Day
114 Mixed, Seven and Six Day 288 115 Mixed, Two, Three and Five Day 289 116 Mixed, Seven and Five Day 290 117 Mixed, Seven and Five Day, Variant 1 291 118 Mixed, Seven and Five Day, Variant 2 292 119 Mixed, Two, Three and Four Day 293
FIVE AND A HALF TEAM ROTAS
Three (8hr) Shifts a Day
120 Three Day, (1x1x1) 294 121 Four Day, Single 296 122 Six Day, (2x2x2) 298 123 Seven Day, Single 300 124 Seven Day, Single, Variant 1 302 125 Seven Day, Single, Variant 2 304 126 Seven Day, (2x2x3) 306
Two (12hr) Shifts a Day
127 Two Day Single 308 128 Four Day, Single 310 129 Four Day, (2x2) 312 130 Seven Day, Single 314
Four (6hr) Shifts a Day
131 Four Day, Single 316 132 Four Day, (1x1x1x1) 318 133 Seven Day, Single 320
SIX TEAM ROTAS
Three (8hr) Shifts a Day
134 Two Day, Single 322 135 Three Day, Single 323 136 Three Day, (1x1x1) 325 137 Four Day, Single 326 138 Five Day Single 328 139 Six Day, Single 330 140 Six Day, (2x2x2) 332 141 Six Day, (2x2x2), Variant 1 333 142 Seven Day, Single 334 143 Seven Day, Single, Variant 1 335 144 Seven Day, (2x2x3) 336 145 Seven Day, (2x2x3), Variant 1 337 146 Mixed, Two and Four Day 338 147 Mixed, Two and Four Day, Single and (2x2) 340 148 Mixed, Three and Six Day, Single and (3x3) 341 149 Two Day Single 343
Two (12hr) Shifts a Day
150 Four Day, Single 344 151 Four Day, (2x2) 346 152 Seven Day, Single 347
Four (6hr) Shifts a Day
153 Four Day, Single 348 154 Four Day, (2x2) 350 155 Seven Day, Single 351
REST DAY COVER
Three (8hr) Shifts a Day
156 Five Team, Six Day, (2x2x2) 352 157 Five Team, Six Day, (2x2x2) 353 158 Five Team, Seven day, Single 354 159 Five Team, Seven day, Single 355 160 Five Team, Seven day, (2x2x3) 356
Two (12hr) Shifts a Day
161 Five Team, Two and Three Day, Single 357 162 Five Team, Two and Three Day, Single 358 163 Five Team, Three and Four Day, Single 359
COVER FROM EXTENDED SHIFTS
Three (8hr) Shifts a Day
164 Five Team, Five Day, Single 360 165 Five Team, Five Day Single 361 166 Five Team, Six Day, (2x2x2) 362 167 Five Team, Six Day, (2x2x2) 363 168 Five Team, Six Day, (2x2x2) 364 169 Five Team, Seven day, Single 365 170 Five Team, Seven day, Single 366
HOLIDAY ROTAS
Three (8hr) Shifts a Day
171 Two Week Holiday, Six Day, (2x2x2) 367 172 Two Week Holiday, Six Day, (2x2x2) 368 173 Two Week Holiday, Seven Day, (2x2x3) 369 174 Three Week Holiday, Seven Day, (2x2x3) 370 175 Three Week Holiday, Seven Day, (2x2x3) 371 176 Three Week Holiday, Seven Day, (2x2x3) 372 177 Three Week Holiday, Seven Day, Single 373 178 Three Week Holiday, Seven Day, Single 374
Two (12hr) Shifts a Day
179 Two Week Holiday, Four Day, (2x2) 375 180 Two Week Holiday, Four Day, (2x2) 376 181 Two Week Holiday, Four Day, (2x2) 377 182 Two Week Holiday, Seven Day, Single 378 183 Three Week Holiday, Seven Day, Single 379 184 Three Week Holiday, Seven Day, Single 380 185 Three Week Holiday, Three Day, Single 381
INTEGRATED DAYS.
Six Team
Three (8hr) Shifts a Day
186 Six Day, (2x2x2), plus Five Days 382 187 Six Day, (2x2x2), plus Five Days 383 188 Seven Day, Single, plus Five days 385 189 Seven Day, (2x2x3), plus Six Days 386 190 Seven Day, Single, plus Seven Days 387 191 Seven Day, Single, plus Seven Days 388 192 Four and Five Day, Single, plus Five Days 389
Seven Team
193 Four and Five Day, Single, plus Five Days. 390
INTEGRATED ANNUAL HOURS ROTAS
Four Team Rotas
Two(12hr) Shifts a Day
Basic plus Summer Rota
194 392
Basic plus Spring, Summer and Autumn Rotas
195 394 196 396 197 398 198 400 199 402 200 404
Five Team Rotas
Three (8hr) Shifts a Day
Basic Rota Only
201 406 202 408 203 410
Basic plus Summer Rota
204 412 205 414 206 416 207 418 208 420 209 422 210 424 211 426 212 428 213 430 214 432 215 434 216 436
Basic Rota plus Spring and Summer Rotas
217 438 218 440 |